外文期刊 | 重庆交通大学图书馆
  
 
 
 
馆长信箱 | CDISS  | 学校主页  
      图书馆首页 读者服务 馆藏及资源 网络导航 读者指南 资源远程访问   

外文期刊    -外文期刊阅览室(图书馆201室)


    Civil Engineering (December 2008 Vol. 78, No. 12)        2009-10-19 04:18:37

Civil Engineering (The Magazine of the American Society of Civil Engineers)

December 2008  Vol. 78, No. 12

Contents

 

Features

 

38  Crystal Clear

    By Andrew Mueller-Lust, P. E., M. ASCE

       Designed to achieve the highest possible rating for environmental stewardship, the 55-story Bank of America Tower at One Bryant Park, in midtown Manhattan, was envisioned as an iconic structure that would serve as a model for the design and construction fo future office building.

 

48  A Necessary Diversion

       By George Slovensky, P. E.,William Taggart, P. E., Alan Stroppini, P. E., and Tony Firenzi, P. E.

       A unique multiuse diversion facility on the American River near Auburn, California, affords a reliable water supply, ensures adequate base flows to address environmental concerns, facilitates the passage of fish and boats, and provides white-water recreational opportunities. Concluding a process that began more than 40 years ago with the construction of the ill-fated Auburn Dam, the facility brings flows back to a previously dewatered stretch of the channel.

 

54  Elegant Efficiency

       By Seshadri Srinivasan, Ceng, and Gopal Srinivasan, Ph. D., CEng

       The design of the Sungai Prai Bridge, a cable-stayed structure that completes a ring road in Malaysia, uses a precast deck atop a multicellular box girder with precast cantilevers and in doing so shows that stunning beauty need not involve exorbitant costs.

 

60  Saving a City’s Sewers

By Robert A. Pennington, P. E., Kristie A. Gersley, P. E., Anthony Gagliostro, P. E., M. ASCE, Daniel T. Eagan, Alvin L. Zach, P. E., L. S., M. ASCE, and John T. George, P. E., A. M. ASCE

Nearly half of the 68 mi (109 km) of brick sewers in Newark, New Jersey, some of which are more than 150 years old, have been rehabilitated using cured-in-place pipe. But to make sure the sewers last another cencury, the city required construction crews to pay particular attention to such details as lateral connection cutouts in the lining and the structural rehabilitation of manholes.

 

Departments

 

8 Letters

 

10 Polity Briefing

 

12 Civil Engineering News

       Top-down design

       Asymmetrical bridge

       Potential wind power

       Structures from shipping containers

       Context-sensitive museum

       Interchange untangled

       Miami River dredged

Pivoting bridge

Cable-stayed pedestrian bridge

Outriggers strengthen tower

       News Briefs

 

32      Technology

 

34  History Lesson

 

37 Editor’s Note

 

68 Books

 

84 The Law